Sunday, September 28, 2008

Footings are in!



Footings are poured and the basemenet walls should be in soon and the plumbing will be roughed in shortly after that. Enjoy the pictures.

Friday, September 26, 2008

The Hole is Dug!


September 25th the hole was dug for 3007 SW Snyder Blvd. This home is being Built by Behr Construction Homes. Pictures are to come and the building process will be documented on a weekly basis.